
- Replaced existing 800 amp/208 volt/3 phase service with a 1,000 amp/208 volt/3 phase service.
- Installed concrete transformer vault with safety bollards.
- Provided new weatherproof meter C.T. cabinet mounted on aluminum backboard.
- Provided all underground conduits and wire for a complete system.
- Provided a new 1,000 amp main breaker distribution panel and 6 sub panels, of which 1 sub-panel containing a shunt trip main for all kitchen equipment located within the exhaust hood area. (Connected to hood exhaust fan system controls.)
- Project
New Restaurant - Location
Goldsboro, PA - Client
Hillside Café - Industry
Commercial - Areas Serviced
- Electrical
- Automation
- Fire/Security
- Datacom
- Engineering/Design