Replaced existing 800 amp/208 volt/3 phase service with a 1,000 amp/208 volt/3 phase service.
Installed concrete transformer vault with safety bollards.
Provided new weatherproof meter C.T. cabinet mounted on aluminum backboard.
Provided all underground conduits and wire for a complete system.
Provided a new 1,000 amp main breaker distribution panel and 6 sub panels, of which 1 sub-panel containing a shunt trip main for all kitchen equipment located within the exhaust hood area. (Connected to hood exhaust fan system controls.)